Representing work spaces generically in construction method models
DOI:10.1061/(ASCE)0733-9364(2002)128:4(296).png)
摘要
En 中文
Construction activities require a set of work spaces to be executed safely and productively. The locations and volumes of these spaces change in three dimensions and across time, according to project-specific design and schedule information. Previous research on construction space management requires users to specify the spatio-temporal data necessary to represent each project-specific space needed for construction. Since a construction schedule consists of hundreds of activities requiring multiple types of spaces, this approach is practically infeasible. There is a need for a generic (project-independent) representation of work spaces, from which the project-specific instances of spaces can be derived automatically based on project-specific design and construction schedule information. This paper formalizes such a generic space description as a computer-interpretable ontology. This ontology is general, reusable, and comprehensive. A prototype system developed uses this ontology to capture the spatial requirements associated with construction methods and to automate the generation of project-specific spaces represented in three dimensions and across time.
Keyword:
construction methods
workspace
scheduling
construction management
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
暂无机构信息
引用论文
Factors influencing the long-term dynamics of larval sea lice density at east and west coast locations in Scotland影响苏格兰东西海岸地点海虱幼虫密度长期动态的因素
Antibacterial and Resistance Modifying Activities of Nigella sativa Essential Oil and its Active Compounds Against Listeria monocytogenes
In Vivo
IF0
Two Synthetic Antibodies that Recognize and Neutralize Distinct Proteolytic Forms of the Ebola Virus Envelope Glycoprotein
ChemBioChem
IF0