Research on assembly scheduling problem with nested operations

delete2023-01-01
delete3
PRE
AI
郝海强 (Haiqiang Hao)
朱海平 (Haiping Zhu) *
L
Liezheng Shen
G
Guohui Zhen
Z
Zhipeng Chen
DOI:10.1016/j.cie.2022.108830delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
A two-stage assembly scheduling problem with nested operations (nASP) is proposed to minimise the bi-criteria of makespan and the specified average passage time (P-ave) in the rocket tank welding workshop. The nASP's tanks are assembled utilising a variety of parts and machining techniques. Depending on the type of tank, there are different numbers of usable parts. Additionally, at the first stage, parallel available machines, operation-dependent setup times, unpredictable rework, and dynamic machining times are considered. Eight heuristics and two lower bounds are first developed, then a logistic-based improved genetic algorithm (LBIGA) is presented while considering the characteristics of the solutions. To further optimize the P-ave while maintaining the makespan, a heuristic built on backward computations is also suggested. Then, utilising the offered algorithms as well as genetic algorithm (GA), Tabu search (TS), and variable neighbourhood search (VNS) from the literature, randomly generated instances of nASP are resolved and compared. Ultimately, the numerical trials show the viability and efficacy of the presented algorithms.
Keyword:
Rocket tank
Assembly scheduling problem
Makespan
Improved genetic algorithm
Backward calculations