Resource-constrained multi-project scheduling problem: A survey

delete2023-09-01
delete40
delete
OA
AI
M
Mariam Gómez Sánchez *
E
Eduardo Lalla‐Ruiz
A
Alejandro Fernández Gil
C
Carlos Castro
S
Stefan Voß
DOI:10.1016/j.ejor.2022.09.033delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Project Management is becoming increasingly crucial in competitive environments such as manufacturing and the service industries. The Resource-Constrained Multi-Project Scheduling Problem (RCMPSP) consists of assigning start times to jobs corresponding to two or more projects that must be executed simulta-neously while respecting the precedence between jobs and limited resources. The existing rise in the study of the RCMPSP resulted in numerous works on the topic while proposing different problem fea-tures. This research analyzes different variants of the problem based on aspects related to jobs, projects, relationships, resources, and time management. Moreover, based on the problem variants considered in the collected works, a taxonomy allowing (i) the identification and positioning of each RCMPSP variant and (ii) the analysis of the current state-of-the-art of the problem is proposed. In addition, the solution methods proposed to solve RCMPSPs are classified and analyzed, together with the benchmarks used to validate such approaches. Finally, this review paper discusses the RCMPSP connection to practice and provides future research opportunities in light of recent advances.(c) 2022 Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
Keyword:
Project scheduling
Resource constrained
Multi project
Project management
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

U
Universidad Tecnica Federico Santa Maria
学者数:
3.0K
论文数: 3.1K
被引数: 25
U
university of hamburg
学者数:
3.7W
论文数: 2.9W
被引数: 30
U
university of twente
学者数:
1.5W
论文数: 1.4W
被引数: 9
学者 查看更多机构
引用论文

引用论文

L'épargnant au bord de la crise
err2012-12-01
err0
errOAAI
errLuc Arrondel; Vladimir Borgy; Frédérique Savignac
err分享
err收藏
Strong bounds for resource constrained project scheduling: Preprocessing and cutting planes
err2020-01-01
err18
errOAAI
errAraujo, Janniele A. S.; Santos, Haroldo G.; Gendron, Bernard; Jena, Sanjay Dominik; Brito, Samuel S.; Souza, Danilo S.
err分享
err收藏
Resource-constrained multi-project scheduling with activity and time flexibility
err2020-12-01
err30
errOAAI
errHauder, Viktoria A.; Beham, Andreas; Raggl, Sebastian; Parragh, Sophie N.; Affenzeller, Michael
err分享
err收藏
学者 查看更多内容