Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
DOI:10.1016/S0926-5805(99)00011-4.png)
摘要
En 中文
Traditional analytical and heuristic approaches are inefficient and inflexible when solving construction resource leveling problems. A computational optimization technique, genetic algorithms (GAs), was employed in this study to overcome drawbacks of traditional construction resource leveling algorithms. The proposed algorithm can effectively provide the optimal or near-optimal combination of multiple construction resources, as well as starting and finishing dates of activities subjected to the objective of resource leveling. Furthermore, a prototype of a decision support system (DSS) for construction resource leveling was also developed. Construction planners can interact with the system to carry out ad hoc analysis through what-if queries. (C) 2000 Elsevier Science B.V. All rights reserved.
Keyword:
resource leveling
genetic algorithms
scheduling system
decision support
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
暂无机构信息
引用论文
没有更多内容