Resource levelling optimization model considering float loss impact

delete2018-06-18
delete11
PRE
AI
S
Sameh El-Sayegh *
DOI:10.1108/ECAM-10-2016-0229delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Purpose The purpose of this paper is to propose a Non-Linear Integer Programming (NLIP) model that solves the resource leveling problem while reducing the negative effect of the total float loss on risk. Design/methodology/approach An NLIP model is formulated to solve the resource leveling optimization problem incorporating float loss cost (FLC). The proposed model is implemented using What's Best solver for Excel. The FLC is calculated using the float commodity approach. An example is solved using the proposed model in order to illustrate its applicability. Sensitivity analysis is also performed. Findings The results confirmed that resource leveling reduces the available float of non-critical activities; decreases schedule flexibility and reduces the probability of project completion. The probability of timely completion dropped from 50 percent (for the normal schedule with 32 resource fluctuations) to 13.5 percent for leveled resources with zero fluctuations. Using the proposed method, the number of resource fluctuations is 8 but the probability of completing the project on time improved to 20 percent. Practical implications The proposed model allows project managers to exercise new trade-offs between resource leveling and schedule flexibility which will ultimately improve the chances of successful project delivery. Originality/value Resource leveling techniques result in reducing the available total float for the non-critical activities. Existing methods focus on moving noncritical activities within their available float and ignore the impact of the resulting float loss. This reduces the schedule flexibility and increase the risk of project delays. The proposed model incorporates the FLC into the resource leveling optimization problem resulting in more efficient schedules with improved resource utilization while keeping some schedule flexibility.
Keyword:
Construction management
Project management
Scheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

A
American University of Sharjah
学者数:
2.6K
论文数: 2.5K
被引数: 2.7K
引用论文

引用论文

TNF-α Increase in a Cohort of Depressive Patients
err2021-03-15
err0
errOAAI
errAdrian Groh; Kirsten Jahn; Marc Walter; Johannes Heck; Ralf Lichtinghagen; Eva Janke; Schulze Westhoff M. L; Maximillian Deest; Helge Frieling; Stefan Bleich; Kai G. Kahl; Annemarie Heberlein
err分享
err收藏
err分享
err收藏
Heritability and genetic gain for grain yield and path coefficient analysis of some agronomic traits in early-maturing maize hybrids
err2015-07-14
err0
PREAI
errSiphesihle G. Maphumulo; John Derera; Fikile Qwabe; Pedro Fato; Edmore Gasura; Paramu Mafongoya
err分享
err收藏
学者 查看更多内容