arrow
返回

Resource Scheduling and Delay Analysis for Workflow in Wireless Small Cloud

delete2018-03-01
delete12
PRE
AI
张元 封面图
张元 (Yuan Zhang) *
DOI:10.1109/TMC.2017.2734083delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper studies resource scheduling for wireless small cloud assuming that the execution of an application is modeled as a workflow graph. A scheduling method is proposed which consists of two parts. For the task-to-computing-unit assignment part which operates on the long-term time-scale, the solution is to partition the workflow into task groups which have loose data transfer constraint and each task group is assigned to the computing unit which can finish executing the task group at the earliest time. For the computing and wireless communication resource scheduling part which operates on the short-term time-scale, we simply use the round-robin principle. A part by part delay component estimation method is presented based on which the average delay performance can be analyzed. Simulation results validate the theoretical analysis and show that the proposed method outperforms existing methods. The impact of different parameter settings on the system performance is also investigated.
Keyword:
Delay analysis
resource scheduling
wireless small cloud
workflow
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Mobile Computing 封面图
IEEE Transactions on Mobile Computing
IF:
9.2
论文数:
5.6K
被引数:
1.8W

机构

S
southeast university - china
学者数:
5.3W
论文数: 4.9W
被引数: 57
引用论文

引用论文

err分享
err收藏
Energy-Efficient Offloading for Mobile Edge Computing in 5G Heterogeneous Networks5g异构网络中面向移动边缘计算的高能效卸载
err2016-01-01
err654
errOAAI
errZhang, Ke; Mao, Yuming; Leng, Supeng; Zhao, Quanxin; Li, Longjiang; Peng, Xin; Pan, Li; Maharjan, Sabita; Zhang, Yan
err分享
err收藏
err1999-01-01
err0
PREAI
errJ. Gayle Beck; Melinda A. Stanley; Barbara J. Zebb
err分享
err收藏
err分享
err收藏
The Promise of Edge Computing边缘计算的承诺
err2016-05-01
err835
PREAI
errShi, Weisong; Dustdar, Schahram
err分享
err收藏
Ecology of sea ice biota
err1992-09-01
err0
PREAI
errLouis Legendre; StephenF. Ackley; GerhardS. Dieckmann; Bj�rn Gulliksen; Rita Horner; Takao Hoshiai; IgorA. Melnikov; WilliamS. Reeburgh; Michael Spindler; CorneliusW. Sullivan
err分享
err收藏
FOGGY CLOUDS AND CLOUDY FOGS: A REAL NEED FOR COORDINATED MANAGEMENT OF FOG-TO-CLOUD COMPUTING SYSTEMS
err2016-10-01
err180
errOAAI
errMasip-Bruin, Xavi; Marin-Tordera, Eva; Tashakor, Ghazal; Jukan, Admela; Ren, Guang-Jie
err分享
err收藏
Cloud-Based Augmentation for Mobile Devices: Motivation, Taxonomies, and Open Challenges
err2014-01-01
err310
errOAAI
errAbolfazli, Saeid; Sanaei, Zohreh; Ahmed, Ejaz; Gani, Abdullah; Buyya, Rajkumar
err分享
err收藏
学者 查看更多内容