Advances in robotic construction are evident and increasing every year, bringing present and potential improvements. However, the economic and social impacts are hard to assess and quantify without physical in situ testing, which is expensive and time-consuming. This paper presents a methodology for the simulation of robotic construction technologies, namely drones, using a virtual reality environment. Our hypothesis is that a virtual reality simulation of a robotic construction (H1) has the potential of increasing the precision of predicting the construction duration and cost and (H2) allows for the detection of construction problems. The study begins with a review of the literature on drones, robotic arms, and hybrid automatic construction solutions, as well as virtual reality construction simulations, summarising the robotic technologies currently being used, mainly in academic research, to assemble construction elements. It then proposes a construction simulation methodology applied to three architectonic elements to analyse different approaches and different scenarios for robotic construction simulation methodology. A construction simulation is tested, and the data is analysed and compared with traditional construction methods, focussing on construction time and costs.
Keyword:
Robotic construction
Virtual reality
Drone
Robotic arm
Construction simulation
Assembly
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Heliyon 封面图
Heliyon
IF:
3.6
论文数:
3.8W
被引数:
11.8W

机构

I
instituto universitario de lisboa
学者数:
16
论文数: 21
被引数: 1
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Barriers to adopting simulation modelling in construction industry
err2020-03-01
err40
errOAAI
errAbdelmegid, M. A.; Gonzalez, V. A.; Poshdar, M.; O'Sullivan, M.; Walker, C. G.; Ying, F.
err分享
err收藏
Physical simulation of construction and control of two butted-well horizontal cavern energy storage using large molded rock salt specimens
errENERGY
IF9.4
err2019-10-01
err145
PREAI
errLiu, Wei; Zhang, Zhixin; Chen, Jie; Fan, Jinyang; Jiang, Deyi; Jjk, Daemen; Li, Yinping
err分享
err收藏
Observation of subnatural-linewidth spectra in cold Li6 atoms
err2021-03-18
err0
PREAI
errRui Li; Yuelong Wu; Yang Rui; Haibin Wu
err分享
err收藏
A VR training system for learning and skills development for construction workers
err2020-09-26
err43
PREAI
errOsti, Francesco; de Amicis, Raffaele; Sanchez, Christopher A.; Tilt, Azara Betony; Prather, Eric; Liverani, Alfredo
err分享
err收藏
err分享
err收藏
On a human-robot workplace design and task allocation system
err2017-04-03
err101
errOAAI
errTsarouchi, Panagiota; Michalos, George; Makris, Sotiris; Athanasatos, Thanasis; Dimoulas, Konstantinos; Chryssolouris, George
err分享
err收藏
学者 查看更多内容