Robust hydrothermal unit commitment: A mixed-integer linear framework

delete2018-12-01
delete30
PRE
AI
S
Seyed‐Ehsan Razavi
A
Ali Esmaeel Nezhad *
H
Hani Mavalizadeh
F
Fatima Raeisi
A
Abdollah Ahmadi
DOI:10.1016/j.energy.2018.09.199delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The paper presents the info-gap theory for the sake of developing a robust framework for short-term hydrothermal scheduling to tackle severe load uncertainty. Deploying this method, the system operator is provided with a robust decision-making strategy to guarantee the minimum cost under load variation condition while practical and technical limitations such as dynamic ramp rate are taken into consideration. For this purpose, the proposed Unit Commitment (UC) problem considering all above advantages would be modeled in a linear framework, which is in turn taken into account as another outstanding feature of this study as it is compatible to apply to real-world systems. In order to investigate the model efficiency, the modified version of the IEEE 118-bus test system having 54 thermal beside 8 hydro plants is chosen as the case study. Eventually, the results demonstrate how demand fluctuations and errors in the predicted load can be tolerated by allocating additional robust cost. (C) 2018 Elsevier Ltd. All rights reserved.
Keyword:
Hydrothermal scheduling
Information gap decision theory
Mixed integer linear programming
Unit commitment
Uncertain load demand
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Energy 封面图
Energy
IF:
9.4
论文数:
4.2W
被引数:
20.2W

机构

U
University of Birjand
学者数:
1.4K
论文数: 1.2K
被引数: 965
U
University of Bologna
学者数:
4.5W
论文数: 3.8W
被引数: 4.1W