Electricity cost has become a critical concern of data center operations with the rapid increasing of information processing demand. Data center microgrid (DCMG) is a promising way to reduce electric energy consumption from traditional fossil fuel generators and the billing cost, by effectively utilizing local renewable energy, e.g., wind power. However, uncertainties of wind power generation and real-time workload of data center would have significant impacts on the operational efficiency of DCMG, especially when it is in the island mode. For this reason, a novel affinely adjustable policy based robust multi-objective optimization model under flexible uncertainty set is proposed in this paper, which simultaneously optimizes wind power curtailment, the operation cost, and the over-plus level of computation resource, while considering uncertainties of both the wind power and real-time workload. Through numerical simulation studies, the validity of robust multi -objective optimization model for the island operation of DCMG is verified. Besides, the effectiveness of the proposed methods, i.e., the novel affinely adjustable policy and the flexible uncertainty set, in handling uncertainties are evaluated. Compared to the conventional robust multi-objective optimization model, the proposed approach reduces the operating costs of about 10% in average while maintaining similar reliability in numerical simulations. Moreover, the complex quantitative relationship among these multiple objectives is further investigated. Simulation results indicate the minimization of wind power curtailment and over-plus level of computation resource increases about 25% of the operation cost. These quantitative relationships can well support the decision making of DCMG operation management.
Keyword:
Data center microgrid
Flexible uncertainty set
Affinely adjustable policy
Robust multi-objective optimization

期刊

Applied Energy 封面图
Applied Energy
IF:
11
论文数:
2.6W
被引数:
17.8W

机构

U
university of bath
学者数:
1.1W
论文数: 1.3W
被引数: 13
S
Stevens Institute of Technology
学者数:
2.9K
论文数: 2.9K
被引数: 3.2K
引用论文

引用论文

Flexible Scheduling of Microgrid With Uncertainties Considering Expectation and Robustness
err2018-07-01
err12
errOAAI
errLi, Yuanzheng; Zhao, Tianyang; Wang, Ping; Gooi, Hoay Beng; Ding, Zhaohao; Li, Kaicheng; Yan, Wei
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
Multi-Objective Optimal Dispatch of Microgrid Under Uncertainties via Interval Optimization
err2019-03-01
err98
errOAAI
errLi, Yuanzheng; Wang, Ping; Gooi, Hoay Beng; Ye, Jian; Wu, Lei
err分享
err收藏
A survey of industrial applications of Demand Response
err2016-12-01
err210
PREAI
errShoreh, Maryam H.; Siano, Pierluigi; Shafie-khah, Miadreza; Loia, Vincenzo; Catalao, Joao P. S.
err分享
err收藏
Robust Risk-Constrained Unit Commitment With Large-Scale Wind Generation: An Adjustable Uncertainty Set Approach
err2017-01-01
err125
errOAAI
errWang, Cheng; Liu, Feng; Wang, Jianhui; Qiu, Feng; Wei, Wei; Mei, Shengwei; Lei, Shunbo
err分享
err收藏
err分享
err收藏
学者 查看更多内容