返回
Robust Optimization Based Optimal DG Placement in Microgrids
DOI:10.1109/TSG.2014.2321748.png)
摘要
En 中文
This paper proposes a novel Microgrid (MG) planning methodology to decide optimal locations, sizes and mix of dispatchable and intermittent distributed generators (DGs). The long-term costs in the proposed planning model include investment, operation and maintenance (O&M), fuel and emission costs of DGs while the revenue includes payment by MG loads and utility grid. The problem is formulated as a mixed-integer program (MIP) considering the probabilistic nature of DG outputs and load consumption, wherein the costs are minimized and profits are maximized. The model is transformed to be a two-stage robust optimization problem. A column and constraint generation (CCG) framework is used to solve the problem. Compared with conventional MG planning approaches, the proposed model is more practical in that it fully considers the system uncertainties and only requires a deterministic uncertainty set, rather than a probability distribution of uncertain data which is difficult to obtain. Case studies of a MG with wind turbines, photovoltaic generators (PVs) and microturbines (MTs) demonstrate the effectiveness of the proposed methodology.
Keyword:
Distributed Generator (DG)
distribution network
microgrid (MG)
mixed integer program (MIP)
robust optimization
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
9.8
论文数:
5.7K
被引数:
4.3W
机构
引用论文
Distribution System Planning With Incorporating DG Reactive Capability and System Uncertainties结合DG无功能力和系统不确定性的配电系统规划

