返回
Scheduling continuous aluminium casting lines
DOI:10.1080/00207540701355212.png)
摘要
En 中文
This study considers the problem of scheduling casting lines of an aluminium casting and processing plant. In aluminium processing plants, continuous casting lines are the bottleneck resources, i.e. factory throughput is limited by the amount of aluminium that can be cast. The throughput of a casting line might be increased by minimizing total setup time between jobs. The objective is to minimize setup time on production lines for a given time period while balancing workload between production lines to accommodate potential new orders. A mathematical formulation for scheduling jobs to minimize the total setup time while achieving workload balance between the production lines is presented. Since the casting scheduling problem is an NP-hard problem, even with only one casting line, a four-step algorithm to find good solutions in a reasonable amount of time is proposed. In this process, a set of asymmetric travelling salesman problems is followed by a pairwise exchange heuristic. The proposed procedure is applied to a case study using real casting data.
Keyword:
aluminium cast scheduling
asymmetric travelling salesman problem
heuristics
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.1W
被引数:
3.7W
机构
引用论文
Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic使用多目标蚁群优化元启发式调度铝的连铸