返回
Scheduling multi-product tree-structure pipelines
DOI:10.1016/j.compchemeng.2010.03.018.png)
摘要
En 中文
The problem discussed in this paper is short-term scheduling of distribution of petroleum derivatives from a single oil refinery to a number of depots through a tree-structure pipeline. Scheduling product batches in pipelines is a very complex task with many constraints to be considered. Batches of refined products and grades are pumped back-to-back in the pipeline, often with no separation device between batches. In this work a continuous-time, MILP problem representation for tree-structure pipelines is proposed. The approach is successfully applied to a number of pipeline scheduling problems, including a real-world problem. The data and experimental results are reported. (C) 2010 Elsevier Ltd. All rights reserved.
Keyword:
Scheduling
Tree-structure pipeline
MILP formulation
Oil industry
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
3.9
论文数:
8.1K
被引数:
1.7W

