We study single machine scheduling problems with an additional option of performing a weight-modifying-activity. If such an activity is performed, the cost of subsequent jobs is reduced, as reflected by smaller job-weights. We focus first on minimizing total weighted completion time. A pseudo-polynomial dynamic programming algorithm is introduced for this problem. Several special cases of unit processing time jobs are solved in polynomial time. We also solve in polynomial time (an extension of) the minmax version of the problem, by adapting the well-known Lawler's Algorithm for minimizing maximum cost on a single machine.
Keyword:
Scheduling
Single machine
Weight-modifying-activity
Total weighted completion time
Dynamic programming
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Annals of Operations Research 封面图
Annals of Operations Research
IF:
4.5
论文数:
8.0K
被引数:
2.1W

机构

U
University of Sydney
学者数:
6.5W
论文数: 6.2W
被引数: 90
H
Hebrew University of Jerusalem
学者数:
2.8W
论文数: 2.3W
被引数: 2.7W
引用论文

引用论文

err分享
err收藏
学者 查看更多内容