Setting tolerance limits for statistical project control using earned value management
DOI:10.1016/j.omega.2014.06.001.png)
摘要
En 中文
Project control has been a research topic since decades that attracts both academics and practitioners. Project control systems indicate the direction of change in preliminary planning variables compared with actual performance. In case their current project performance deviates from the planned performance, a warning is indicated by the system in order to take corrective actions. Earned value management/earned schedule (EVM/ES) systems have played a central role in project control, and provide straightforward key performance metrics that measure the deviations between planned and actual performance in terms of time and cost. In this paper, a new statistical project control procedure sets tolerance limits to improve the discriminative power between progress situations that are either statistically likely or less likely to occur under the project baseline schedule. In this research, the tolerance limits are derived from subjective estimates for the activity durations of the project. Using the existing and commonly known EVM/ES metrics, the resulting project control charts will have an improved ability to trigger actions when variation in a project's progress exceeds certain predefined thresholds A computational experiment has been set up to test the ability of these statistical project control charts to discriminate between variations that are either acceptable or unacceptable in the duration of the individual activities. The computational experiments compare the use of statistical tolerance limits with traditional earned value management thresholds and validate their power to report warning signals when projects tend to deviate significantly from the baseline schedule. (c) 2014 Elsevier Ltd. All rights reserved.
Keyword:
Project management
Scheduling
Risk
Simulation
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
O
IF:
7.2
论文数:
3.7K
被引数:
1.4W