返回
Simulation-based performance comparison between dynamic cells, classical cells and job shops: a case study
DOI:10.1080/00207540601138312.png)
摘要
En 中文
This paper presents the results of a simulation-based performance comparison between dynamic cellular (DC) manufacturing systems and two other well-known systems, namely classical cells (CC) and job shop systems (JS). The performance comparison is made at different levels of turbulence. The experiment contains 13 independent variables, most of them related to demand turbulence, and 17 dependant variables related to performance measure. A stochastic simulation model developed on Microsoft Visual FoxPro 5.0 was used in combination with LINDO (a linear/integer programming software) to obtain the initial results. In view of the large number of variables and the time required to run each experiment, a Taguchi plan was used to optimize the model. The results obtained from the analysis of variance indicate that dynamic cellular manufacturing systems are generally more efficient than classical cellular systems or job shop systems, especially with respect to the average and maximum throughput time, mean and maximum work-in-process, mean and maximum tardiness, and the total marginal cost for a given horizon.
Keyword:
simulation
dynamic cell
classical cell
job shop
JIT
SMED
DCMS
SME
virtual cell
model
experimental design
factors
experimental plan
priority rules
schedule
interaction
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.1W
被引数:
3.7W
机构
引用论文
没有更多内容

