arrow
Return

Simultaneous Process Scheduling and Control: A Multiparametric Programming-Based Approach

delete2018-02-26
delete45
PRE
AI
B
Burnak, Bans
J
Justin Katz
N
Nikolaos A. Diangelakis
E
Efstratios N. Pistikopoulos *
DOI:10.1021/acs.iecr.7b04457delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
We present a systematic framework to derive model-based simultaneous strategies for the integration of scheduling and control via multiparametric programming. We develop offline maps of optimal scheduling actions accounting for the closed-loop dynamics of the process through a surrogate model formulation that incorporates the inherent behavior of the control scheme. The surrogate model is designed to translate the long-term scheduling decisions to time varying set points and operating modes in the time scale of the controller. The continuous and binary scheduling decisions are explicitly taken into account in the multiparametric model predictive controllers. We showcase the framework on a stand-alone three-product continuous stirred tank reactor, and two reactors operating in parallel.
Keywords:
INTEGER DYNAMIC OPTIMIZATION
CLOSED-LOOP IMPLEMENTATION
OPTIMAL GRADE TRANSITION
MODEL-BASED INTEGRATION
CHEMICAL-PROCESSES
PRODUCTION LINES
PROCESS SYSTEMS
PROCESS DESIGN
COMBINED HEAT
UNCERTAINTY
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

I
Industrial and Engineering Chemistry Research
IF:
3.9
Papers:
4.0W
Citations:
9.6W

Organization

T
Texas A&M University System
Scholars:
4.4W
Papers: 4.0W
Citations: 4.0K