We consider single-machine scheduling problems with a batch-dependent ageing effect and variable maintenance activities between batches. The machine can process several jobs as a batch. It requires maintenance activities where the maintenance time depends on the flow time of the pre-batch, i.e. the batch processed before a batch. A job's actual processing time is an increasing exponential function of its operation time within a batch. The objectives are to minimise the makespan and the total completion time. We develop polynomial time algorithms for the makespan minimisation problem and the total completion time minimisation problem under the condition that the ageing factor is greater than one. We also provide a mathematical programming approach and two heuristic algorithms to analyse the total completion time minimisation problem when the ageing factor is less than one for even one batch. The computational analysis indicates that the proposed heuristic algorithms are more efficient for the smaller ageing factor, whereas the Modified Shortest Processing Time algorithm is more efficient than the proposed heuristic algorithms for the larger ageing factor.
Keyword:
scheduling
single-machine
batch-dependent
ageing effect
maintenance activity
heuristic
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.1W
被引数:
3.7W
机构
引用论文
Single machine total completion time scheduling problem with workload-dependent maintenance duration