arrow
返回

Smart building assessments: optimizing SRI calculation using a BIM-based data exchange framework

delete2025-10-14
delete0
delete
OA
AI
M
Maurizio Calandri *
L
Louis Tafelmaier
T
Torben Rathje
M
Michael Müller
T
Tobias Henzler
K
Konstantinos Stergiaropoulos
M
Michael Kramp
A
Andreas Glatz
DOI:10.3389/fbuil.2025.1634162delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
数据不足、计算工具有限以及专家的主观决策,在确定建筑智能准备度指标时会导致结果模糊。此外,它并非规划过程的固有组成部分。因此,本研究提出了一种一致且面向过程的规划和计算方法。该方法包括建筑信息模型、标签系统和数据交换格式之间的信息组合与交换。它为集成规划全过程提供了一致、无缝的信息流。这使得能够基于楼层相关功能评估自动计算计划的智能准备度指标,并通过样机验证了这一点。此外,它还为计划组件所需信息提供了清晰的分类,可用于验证过程。总体而言,这显著减少了智能建筑评估所需的时间和精力,同时提高了评估的一致性。
Keyword:
building information modeling (BIM)
smart readiness indicator (SRI)
integrated planning
digital twin
building automation and control systems (BACS)

期刊

F
Frontiers in Built Environment
IF:
2.7
论文数:
313
被引数:
3.4K

机构

U
University of Stuttgart
学者数:
1.1W
论文数: 9.4K
被引数: 1.3W
引用论文

引用论文

Integration und modellbasierte Ableitung des Smart Readiness Indicators bei Anwendung der BIM-Methodik
errHLH
IF0
err2023-01-01
err0
PREAI
errCalandri,Maurizio; Henzler,Tobias; Stergiaropoulos,Konstantinos; Genswein,Markus; Tafelmaier,Louis; Müller,Michael; Arold,Jörg; Schönburg,Eric; Glatz,Andreas; Kramp,Michael; Bode,Gerrit
err分享
err收藏
Building information modeling and building performance simulation interoperability: State-of-the-art and trends in current literature
err2022-10-01
err23
PREAI
errDi Biccari, Carla; Calcerano, Filippo; D'Uffizi, Francesca; Esposito, Antonio; Campari, Massimo; Gigliarelli, Elena
err分享
err收藏
Analysis of the Building Smart Readiness Indicator Calculation: A Comparative Case-Study with Two Panels of Experts
err2020-06-01
err0
errOAAI
errIlaria Vigna; Roberta Pernetti; Giovanni Pernigotto; Andrea Gasparella
err分享
err收藏
Objective-driven and Pareto Front analysis: Optimizing time, cost, and job-site movements
err2016-09-01
err20
PREAI
errFaghihi, Vahid; Reinschmidt, Kenneth F.; Kang, Julian H.
err分享
err收藏
Supporting building automation systems in BIM/IFC: reviewing the existing information gap
err2020-02-22
err14
PREAI
errVieira, Renato; Carreira, Paulo; Domingues, Pedro; Costa, Antonio Aguiar
err分享
err收藏
Building automation system - BIM integration using a linked data structure建筑自动化系统-使用链接数据结构的BIM集成
err2020-10-01
err49
errOAAI
errQuinn, Caroline; Shabestari, Ali Zargar; Misic, Tony; Gilani, Sara; Litoiu, Marin; McArthur, J. J.
err分享
err收藏
学者 查看更多内容