Soft logic delay analysis technique

delete2022-01-01
delete3
PRE
AI
S
Su-Ling Fan *
DOI:10.1016/j.autcon.2021.103971delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Current delay analysis techniques assume that there is only one logical sequence of activities in a project. However, in a real construction project, the relationship of activities can be demonstrated by both fixed and soft logic. Fixed logic requires activities to be executed in a specific order, whereas soft logic allows activities to be executed in various orders. Due to the existence of soft logic and the contractor's obligation to mitigate delays, it is necessary to update the logic to calculate Extension of Time (EOT). However, when soft logic is present in a schedule, manual updates are time-consuming and error-prone. To facilitate soft logic updates, several models have been proposed, however, these methods only update soft-logics within activities of the same work item, rather than project-wide. To overcome the limitations of the previous research, this paper proposes an algorithm to update schedules according to delay events project-wise. Furthermore, the proposed model has been verified using practical cases, demonstrating a successful way of applying this model to update schedules based on delay events, allowing EOT to be calculated automatically as well as more accurately and reasonably.
Keyword:
Soft-logic
Delay claims
Extension of time (EOT)

期刊

Automation in Construction 封面图
Automation in Construction
IF:
11.5
论文数:
6.3K
被引数:
4.2W

机构

T
tamkang university
学者数:
2.6K
论文数: 3.1K
被引数: 48
引用论文

引用论文

Polycyclic aromatic hydrocarbons in groundwater of oil-rich regions of upper Brahmaputra Valley, India: linkages of colloidal transport
err2023-01-05
err0
PREAI
errJinu Deka; Kali Prasad Sarma; Nitu Gupta; Md. Sahbaz Ahmed; M. A. Jafar Mazumder; Raza R. Hoque
err分享
err收藏
Delay analysis in construction projects with no updated work schedules
err2020-05-21
err11
PREAI
errTurkakin, Osman Hurol; Manisali, Ekrem; Arditi, David
err分享
err收藏
Mechanism of phenanthrene degradation by the halophilic Pelagerythrobacter sp. N7
err2024-02-01
err0
PREAI
errXiangjin Li; Xinghong Cao; Zuotao Zhang; Yichun Li; Yue Zhang; Chongyang Wang; Weihua Fan
err分享
err收藏
学者 查看更多内容