Software cost estimating for CMMI Level 5 developers
DOI:10.1016/j.jss.2015.03.069.png)
摘要
En 中文
This article provides analysis results of Capability Maturity Model Integrated Level 5 projects for developers earning the highest level possible, using actual software data from their initial project estimates. Since there were no measures to verify software performance, this level was used a proxy for high quality software. Ordinary least squares regression was used to predict final effort hours with initially estimated variables obviates the need to estimate growth or shrinkage for typical changes occurring in software projects, regardless of software developer (contracted or in-house). The OLS equations, or cost estimating relationship equations, were evaluated by a series of standards: statistical significance, visual inspection, goodness of fit measures, and academically set thresholds for accuracy measures used in software cost estimating: mean magnitude of relative error and prediction (for determining the percentage of records with 25%, or less, based on their magnitude of relative error score). As several initial estimated variables were strongly correlated to the reported final effort hours and each other, each variable was examined separately. Thirty records from software projects completed in 2003-2008 for the highest process maturity level were used to compute statistically significant equations with implicit growth or shrinkage in their make-up. Published by Elsevier Inc.
Keyword:
Software effort estimation
CMMI Level 5
US DOD
Ordinary least squares regression
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.1
论文数:
5.5K
被引数:
8.4K