arrow
返回

Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm

delete2007-05-31
delete55
PRE
AI
R
Rahimi-Vahed, Alireza *
M
Mirzaei, Ali Hossein
DOI:10.1007/s00500-007-0210-ydelete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Flow shop problems as a typical manufacturing challenge have gained wide attention in academic fields. In this paper, we consider a bi-criteria permutation flow shop scheduling problem, where the weighted mean completion time and the weighted mean tardiness are to be minimized simultaneously. Due to the complexity of the problem, it is very difficult to obtain optimum solution for this kind of problems by means of traditional approaches. Therefore, a new multi-objective shuffled frog-leaping algorithm (MOSFLA) is introduced for the first time to search locally Pareto-optimal frontier for the given problem. To prove the efficiency of the proposed algorithm, various test problems are solved and the reliability of the proposed algorithm, based on some comparison metrics, is compared with three distinguished multi-objective genetic algorithms, i.e. PS-NC GA, NSGA-II, and SPEA-II. The computational results show that the proposed MOSFLA performs better than the above genetic algorithms, especially for the large-sized problems.
Keyword:
bi-criteria permutation flow shop scheduling
multi-objective shuffled frog-leaping algorithm
multi-objective genetic algorithm

期刊

Soft Computing 封面图
Soft Computing
IF:
2.5
论文数:
1.0W
被引数:
2.1W

机构

暂无机构信息
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
学者 查看更多内容