arrow
返回

Solving shift scheduling problem with days-off preference for power station workers using binary integer goal programming model

delete2018-04-19
delete26
PRE
AI
A
Adibah Shuib *
F
Faiq Izzuddin Kamarudin
DOI:10.1007/s10479-018-2848-5delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Shift scheduling problem (SSP) is a complex NP-hard integer programming problem, especially when many shifts and large number of workers of various ranks and multi-skills are involved. Shift scheduling also needs to comply with certain labour regulations and organisation's rules and policies. Various models for SSP have been developed and solved. However, studies on SSP for workers of power stations or utility providers are still lacking. This paper presents the study on shift scheduling of workers at the largest power station in Malaysia. The objectives of this study are to identify main criteria and conditions of SSP at the power station, to formulate a Binary Integer Goal Programming (BGP) model for SSP that optimises workers' day-off preference and to determine the optimal schedule for workers based on the model. The scheduling focuses on three processes which are demand modelling, shift scheduling and day-off scheduling. The study involves scheduling 43 workers in a selected department of the power station for 28days where workers work in three shifts (morning, evening and night shifts) and have standby and rest days. The SSP-BGP model considers workers' day-off preference as its main feature and introduces objective function that maximises the overachievement and minimises under-achievement of the day-off preference. It addresses conflicting multi-objectives in determining the optimal schedule using the goal programming approach. The model also put forward new hard and soft constraints, which reflect the nature of shifts' requirements for these workers when determining the optimal schedule. The required data have been obtained from the power station and validation and verification of the model has been acquired with the cooperation from its personnel. The SSP-BGP model was solved using MATLAB in reasonable time. It significantly reduces the time to obtain a monthly schedule as compared to current manually done scheduling. Based on the 28-day schedule obtained, the day-off preference's satisfaction of workers has increased by 37.21% that is from 43.02% based on the existing prepared schedule to 80.23% according to the schedule produced based on the SSP-BGP model. The model has shown good performance by not only generating optimal schedule based on the required number and composition of workers for shifts but also providing positive impacts on workers through day-off preferences' satisfaction and the possibility of working with different groups.
Keyword:
Shift scheduling
Mathematical programming
Binary integer goal programming
Days-off preference
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Annals of Operations Research 封面图
Annals of Operations Research
IF:
4.5
论文数:
8.1K
被引数:
2.1W

机构

U
Universiti Teknologi MARA
学者数:
5.7K
论文数: 4.1K
被引数: 4.8K
引用论文

引用论文

Primidone therapy in refractory neonatal seizures
err1984-10-01
err0
PREAI
errClydette Powell; Michael J. Painter; Charles E. Pippenger
err分享
err收藏
The Conundrums of Illicit Crude Oil Refineries in Nigeria and Its Debilitating Effects on Nigeria’s Economy: A Legal Approach
err2022-08-25
err0
errOAAI
errOlusola Joshua Olujobi; Elizabeta Smaranda Olarinde; Tunde Ebenezer Yebisi
err分享
err收藏
err分享
err收藏
Optimal implementation of two-qubit linear-optical quantum filters
err2021-06-07
err0
errOAAI
errJaromír Fiurášek; Robert Stárek; Michal Mičuda
err分享
err收藏
err分享
err收藏
学者 查看更多内容