arrow
返回

Solving software project scheduling problems with ant colony optimization

delete2013-01-01
delete69
PRE
AI
J
Jing Xiao *
X
Xian-Ting Ao
Y
Yong Tang
DOI:10.1016/j.cor.2012.05.007delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
Software project scheduling problem (SPSP) is one of the important and challenging problems faced by the software project managers in the highly competitive software industry. As the problem is becoming an NP-hard problem with the increasing numbers of employees and tasks, only a few algorithms exist and the performance is still not satisfying. To design an effective algorithm for SPSP, this paper proposes an ant colony optimization (ACO) approach which is called ACS-SPSP algorithm. Since a task in software projects involves several employees, in this paper, by splitting tasks and distributing dedications of employees to task nodes we get the construction graph for ACO. Six domain-based heuristics are designed to consider the factors of task efforts, allocated dedications of employees and task importance. Among these heuristic strategies, the heuristic of allocated dedications of employees to other tasks performs well. ACS-SPSP is compared with a genetic algorithm to solve the SPSP on 30 random instances. Experimental results show that the proposed algorithm is promising and can obtain higher hit rates with more accuracy compared to the previous genetic algorithm solution. (C) 2012 Elsevier Ltd. All rights reserved.
Keyword:
Scheduling
Automatic software management
Software project scheduling
Ant colony optimization
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

A Max-Min Ant System algorithm to solve the Software Project Scheduling Problem
err2014-11-01
err37
PREAI
errCrawford, Broderick; Soto, Ricardo; Johnson, Franklin; Monfroy, Eric; Paredes, Fernando
err分享
err收藏
Using Ant Colony Optimization algorithm for solving project management problems
err2009-08-01
err44
PREAI
errAbdallah, Hazem; Emara, Hassan M.; Dorrah, Hassan T.; Bahgat, Ahmed
err分享
err收藏
A survey on the Software Project Scheduling Problem
err2018-08-01
err30
PREAI
errAngel Vega-Velazquez, Miguel; Garcia-Najera, Abel; Cervantes, Humberto
err分享
err收藏
Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
err2014-09-16
err107
errOAAI
errMyszkowski, Pawel B.; Skowronski, Marek E.; Olech, Lukasz P.; Oslizlo, Krzysztof
err分享
err收藏

期刊

C
Computers and Operations Research
IF:
4.3
论文数:
6.5K
被引数:
2.3W

机构

中山大学 封面图
中山大学
学者数:
9
论文数: 6
被引数: 5.9W
华南师范大学 封面图
华南师范大学
学者数:
2.0K
论文数: 612
被引数: 9.1K
引用论文

引用论文

Staffing a software project: A constraint satisfaction and optimization-based approach
err2008-10-01
err97
PREAI
errBarreto, Ahilton; Barros, Marcio de O.; Werner, Claudia M. L.
err分享
err收藏
Time-line based model for software project scheduling with genetic algorithms
err2008-10-01
err81
PREAI
errChang, Carl K.; Jiang, Hsin-yi; Di, Yu; Zhu, Dan; Ge, Yujia
err分享
err收藏
Clinical Study on Fluvoxamine Combined with Oxycodone Prolonged-Release Tablets in Treating Patients with Moderate to Severe Cancer Pain
err2015-01-06
err0
errOAAI
errYang Xiao; Jun Liu; Xin-En Huang; Li-Hua Ca; Yi-Min Ma; Wei Wei; Rong-Xia Zhang; Xiao-Hong Huang; Juan Chang; Yi-Jia Wu
err分享
err收藏
CD4+ regulatory T cells in autoimmunity and allergy
err2002-12-01
err0
PREAI
errMaria A Curotto de Lafaille; Juan J Lafaille
err分享
err收藏
学者 查看更多内容