arrow
返回

Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm

delete2022-01-31
delete0
delete
OA
AI
DOI:10.4995/ijpme.2021.16084delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The U-shaped assembly lines help to have more flexibility than the straight assembly lines, where the operators can perform tasks in both sides of the line, the entrance and the exit sides. Having more than one operator in any station of the line can reduce the line length and thereby affects the number of produced products. This paper combines the U-shaped assembly line balancing problem with the multi-manned assembly line balancing problem in one problem. In addition, the processing times of the tasks are considered as stochastic, where they are represented as random variables with known means and variances. The problem is formulated as a mixed-integer linear programming and the cycle time constraints are formulated as chance-constraints. The proposed algorithm for solving the problem is a differential evolution algorithm. The parameter of the algorithm is optimized using experimental design and the computational results are done on 71 adapted problems selected from well-known benchmarks.

期刊

暂无期刊信息

机构

暂无机构信息
引用论文

引用论文

暂无论文信息