This paper addresses the Short-Term Hydrothermal Scheduling - STHS problem of power systems. In this problem, besides the constraints associated to hydro and thermal plants, network constraints are included due to the significant number of hydro plants located far from the load. In the STHS problem, hydro and thermal plants must be coordinated in order to supply the demand at a minimum cost and comply with a set of constraints, over a short-term horizon. Aiming to solve this problem considering the presence of nonlinearities, large number of decision variables and constraints coupled in time periods, we propose a strategy based on Lagrangian Relaxation - LR and Augmented Lagrangian - AL techniques. By using LR scheme, based on a variable splitting technique, the resulting separable dual problem is solved by a Bundle method. A primal feasible solution is obtained using the AL technique, based on the Auxiliary Problem Principle - APP approach, starting from the primal and dual solutions supplied by the LR phase. A computational model that makes use of the proposed strategy is tested on a hydrothermal configuration, whose data were extracted from the Brazilian Hydrothermal power system. (C) 2012 Elsevier B.V. All rights reserved.
Keyword:
Short-Term Hydrothermal Scheduling
Transmission system
Lagrangian Relaxation
Augmented Lagrangian

期刊

Electric Power Systems Research 封面图
Electric Power Systems Research
IF:
4.2
论文数:
1.2W
被引数:
2.2W

机构

暂无机构信息
引用论文

引用论文

Generation scheduling in a deregulated system. The Norwegian case
err1999-01-01
err221
PREAI
errFosso, OB; Gjelsvik, A; Haugstad, A; Mo, B; Wangensteen, I
err分享
err收藏
Optimized 3 T EPI of the amygdalae
err2004-05-01
err0
PREAI
errS Robinson; C Windischberger; A Rauscher; E Moser
err分享
err收藏
Scheduling of Head-Sensitive Cascaded Hydro Systems: A Nonlinear Approach
err2009-02-01
err155
PREAI
errCatalao, J. P. S.; Mariano, S. J. P. S.; Mendes, V. M. F.; Ferreira, L. A. F. M.
err分享
err收藏
err分享
err收藏
Bundle relaxation and primal recovery in unit commitment problems.: The Brazilian case
err2003-01-01
err40
PREAI
errBelloni, A; Lima, ALDS; Maceira, MEP; Sagastizábal, CA
err分享
err收藏
学者 查看更多内容