arrow
返回

Solving the integrated process planning and scheduling problem using an enhanced constraint programming-based approach

delete2021-08-30
delete4
PRE
AI
G
Ganquan Shi
杨
杨周旺 (Zhouwang Yang) *
Y
Yang Xu
Y
Yuchen Quan
DOI:10.1080/00207543.2021.1963496delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Due to various factors of flexibility introduced into manufacturing systems, researchers have gradually shifted their focus to the integrated process planning and scheduling (IPPS) problem to improve productivity. The previous literature rarely associates IPPS with constraint programming, even though constraint programming has achieved success in the scheduling field. Furthermore, existing approaches are usually customized to certain types of IPPS problems and cannot handle the general problem. In this paper, with a view to obtaining the optimal AND/OR graph automatically, a depth first search generating algorithm is designed to convert the type-1 IPPS problem into our approach's standard input format. Moreover, we propose an approach based on enhanced constraint programming to cope with the general problem, employing advanced schemes to enhance the constraint propagation and improve the search efficiency. Our approach is implemented on ORTOOLS, and its superiority is verified by testing on 15 benchmarks with 50 instances. Experimental results indicate that 41 instances are solved optimally, among which the optimality of the solutions for 20 instances is newly confirmed, and the solutions of six instances are improved. Our approach is the first method to reach the overall optimum in the most influential benchmark with 24 instances.
Keyword:
integrated process planning and scheduling
constraint programming
AND
OR graph
graph-based model
depth first search

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

U
university of science & technology of china, cas
学者数:
3.2W
论文数: 2.7W
被引数: 74
C
chinese academy of sciences
学者数:
56.7W
论文数: 45.0W
被引数: 704
引用论文

引用论文

An ensemble-learning model for failure rate prediction
err2020-01-01
err0
errOAAI
errBraglia Marcello; Castellano Davide; Frosolini Marco; Gabbrielli Roberto; Marrazzini Leonardo; Padellini Luca
err分享
err收藏
err分享
err收藏
Integrated process planning and scheduling in a supply chain
err2008-05-01
err76
PREAI
errMoon, Chiung; Lee, Young Hae; Jeong, Chan Seok; Yun, YoungSu
err分享
err收藏
学者 查看更多内容