Solving the Tree-Structured Task Allocation Problem via Group Multirole Assignment

delete2020-01-01
delete36
PRE
AI
D
Dongning Liu
B
Baoying Huang
H
Haibin Zhu *
DOI:10.1109/TASE.2019.2908762delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
Task allocation is a critical phase of project management. Tree-type structures are frequently used constraints to obtain a pertinent task allocation. They can illustrate where one task may require numerous agents and when an agent can be assigned to different tasks (roles). The process of task allocation is made more complex when administrators need to satisfy sequential and fixed branch relationships between/among tasks (roles). This paper formalizes the tree-structured task allocation problem (TSTAP) with group multirole assignment (GMRA) and proves necessary conditions, the necessary and sufficient condition, as well as sufficient conditions, of TSTAP. The formalization makes it easy to find a solution with the IBM ILOG CPLEX optimization package (CPLEX). The necessary conditions improve the CPLEX solution by eliminating infeasible cases. The necessary and sufficient condition describes the solution space of TSTAP completely. Another exciting result is that the sufficient conditions can not only improve the CPLEX solution by describing a practical approximate solution space but also help decision-makers and human resource officers organize a team in order to successfully assign tasks. The proposed approach is verified by simulation experiments with respect to a real-world problem. The experimental results present the practicability of the proposed solutions in this paper. This paper was motivated by general cooperative projects whose tasks have tree-structured relationships. This can make the problem of successful multitask assignment extremely challenging. The traditional method of assignment such as the KM algorithm can no longer solve this problem. To solve the assignment problem with tree-structured relationships, an efficient many-to-many assignment with constraints is required. The proposed approach provides theoretical and technical foundations for efficient assignment of TSTA, which can not only provide a viable and effective assignment scheme for TSTA problems but also help human resource officers to formulate reasonable plans according to the relationships between/among tasks.
Keyword:
Task analysis
Resource management
Peer-to-peer computing
Project management
Collaboration
Poles and towers
Antennas
Agent
collaboration
group multirole assignment (GMRA)
group role assignment (GRA)
role
tree-structured task allocation (TSTA)
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Automation Science and Engineering 封面图
IEEE Transactions on Automation Science and Engineering
IF:
6.4
论文数:
5.4K
被引数:
2.4W

机构

N
nipissing university
学者数:
14
论文数: 15
被引数: 164
广东工业大学 封面图
广东工业大学
学者数:
3.3K
论文数: 980
被引数: 1.7W
引用论文

引用论文

Intraperitoneal Polypropylene Mesh Hernia Repair Complicates Subsequent Abdominal Surgery
err2006-12-01
err0
PREAI
errJ. A. Halm; L. L. de Wall; E. W. Steyerberg; J. Jeekel; J. F. Lange
err分享
err收藏
err分享
err收藏
学者 查看更多内容