Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques
DOI:10.1016/j.ijproman.2015.06.012.png)
摘要
En 中文
The aim of this paper is to describe a new integrated methodology for project control under uncertainty. This proposal is based on Earned Value Methodology and risk analysis and presents several refinements to previous methodologies. More specifically, the approach uses extensive Monte Carlo simulation to obtain information about the expected behavior of the project. This dataset is exploited in several ways using different statistical learning methodologies in a structured fashion. Initially, simulations are used to detect if project deviations are a consequence of the expected variability using Anomaly Detection algorithms. If the project follows this expected variability, probabilities of success in cost and time and expected cost and total duration of the project can be estimated using classification and regression approaches. (C) 2015 Elsevier Ltd. APM and IPMA. All rights reserved.
Keyword:
Project Management
Earned Value Management
Project control
Monte Carlo simulation
Project risk management
Statistical learning
Anomaly Detection
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.5
论文数:
2.6K
被引数:
1.2W
机构
引用论文
The use of the area under the roc curve in the evaluation of machine learning algorithmsroc曲线下面积在机器学习算法评价中的应用
PATTERN RECOGNITION
IF7.6