Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques

delete2015-10-01
delete71
delete
OA
AI
F
Fernando Acebes *
M
María Pereda
D
David Poza
J
Javier Pajares
J
José Manuel Galán
DOI:10.1016/j.ijproman.2015.06.012delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
The aim of this paper is to describe a new integrated methodology for project control under uncertainty. This proposal is based on Earned Value Methodology and risk analysis and presents several refinements to previous methodologies. More specifically, the approach uses extensive Monte Carlo simulation to obtain information about the expected behavior of the project. This dataset is exploited in several ways using different statistical learning methodologies in a structured fashion. Initially, simulations are used to detect if project deviations are a consequence of the expected variability using Anomaly Detection algorithms. If the project follows this expected variability, probabilities of success in cost and time and expected cost and total duration of the project can be estimated using classification and regression approaches. (C) 2015 Elsevier Ltd. APM and IPMA. All rights reserved.
Keyword:
Project Management
Earned Value Management
Project control
Monte Carlo simulation
Project risk management
Statistical learning
Anomaly Detection
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Project Management 封面图
International Journal of Project Management
IF:
7.5
论文数:
2.6K
被引数:
1.2W

机构

Universidad de Burgos 封面图
Universidad de Burgos
学者数:
2.4K
论文数: 2.2K
被引数: 1.9K
U
Universidad de Valladolid
学者数:
8.1K
论文数: 6.7K
被引数: 5.9K
引用论文

引用论文

A review of novelty detection新颖性检测综述
err2014-06-01
err1.2K
PREAI
errPimentel, Marco A. F.; Clifton, David A.; Clifton, Lei; Tarassenko, Lionel
err分享
err收藏
A new approach for project control under uncertainty. Going back to the basics
err2014-04-01
err103
errOAAI
errAcebes, Fernando; Pajares, Javier; Manuel Galan, Jose; Lopez-Paredes, Adolfo
err分享
err收藏
Bagging predictorsBagging预测器
err1996-08-01
err1.0W
PREAI
errBreiman, L
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容