arrow
返回

Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm

delete2021-01-01
delete59
PRE
AI
Y
Yaping Fu
M
MengChu Zhou *
X
Xiwang Guo
亓亮 封面图
亓亮 (Liang Qi)
DOI:10.1016/j.jclepro.2020.123364delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Remanufacturing end-of-life (EOL) products is an important approach to yield great economic and environmental benefits. A remanufacturing process usually contains three shops, i.e., disassembly, processing and assembly shops. EOL products are dissembled into multiple components in a disassembly shop. Reusable components are reprocessed in a processing shop, and reassembled into their corresponding products in an assembly shop. To realize an overall optimization, we have to integrate them together when making decisions. In practice, a decision-maker usually has to optimize multiple criteria such as cost-related and service-oriented objectives. Additionally, we cannot accurately acquire the detail of EOL products due to their various usage processes. Therefore, multi-objective and uncertainty need to be considered simultaneously in an integrated disassembly-reprocessing-reassembly scheduling process. This work investigates a stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling problem to achieve the expected makespan and total tardiness minimization. To handle this problem, this work develops a multi-objective discrete fruit fly optimization algorithm incorporating a stochastic simulation approach. Its search techniques are designed according to this problem's features from five aspects, i.e., solution representation, heuristic decoding rules, smell-searching, vision-searching, and genetic-searching. Simulation experiments are conducted by adopting twenty-five instances to verify the performance of the proposed approach. Nondominated sorting genetic algorithm II, biobjective multi-start simulated annealing method, and hybrid multi-objective discrete artificial bee colony are chosen for comparisons. By analyzing the results with three performance metrics, we can find that the proposed approach performs better on all the twenty-five instances than its peers. Specifically, it outperforms them by 6.45%-9.82%, 6.91%-17.64% and 1.19%-2.76% in terms of performance, respectively. The results confirm that the proposed approach can effectively and efficiently tackle the investigated problem. (C) 2020 Published by Elsevier Ltd.
Keyword:
Remanufacturing
Integrated disassembly-reprocessing-reassembly scheduling
Stochastic multi-objective optimization
Fruit fly optimization
Stochastic simulation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Journal of Cleaner Production 封面图
Journal of Cleaner Production
IF:
10
论文数:
4.7W
被引数:
36.8W

机构

L
Liaoning Petrochemical University
学者数:
3.1K
论文数: 2.0K
被引数: 29
Q
Qingdao University
学者数:
3.1W
论文数: 2.1W
被引数: 3.7W
N
New Jersey Institute of Technology
学者数:
4.2K
论文数: 4.5K
被引数: 4.6K
学者 查看更多机构
引用论文

引用论文

The PPARγ coding region and its role in visceral obesity
err2008-06-01
err0
PREAI
errKhoo Boon Yin; Nazalan Najimudin; Tengku Sifzizul Tengku Muhammad
err分享
err收藏
Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
err2019-05-01
err236
errOAAI
errGao, Kaizhou; Yang, Fajun; Zhou, MengChu; Pan, Quanke; Suganthan, Ponnuthurai Nagaratnam
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
学者 查看更多内容