摘要

摘要

En 中文
A stochastic programming model of the operation of energy plants with the introduction of photovoltaic generation and a storage battery is developed. The uncertainty of the output of the photovoltaic generation is represented by a set of discrete scenarios, and the expected value of the operation cost is minimized. The effectiveness of the stochastic programming model by comparing it with the deterministic model is shown. As an economic evaluation, the recovery period for the initial investment of photovoltaic generation and storage battery is also shown.
Keyword:
Stochastic programming
Optimization
Energy plant
Operational planning
Photovoltaic generation
Unit commitment problem
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

T
THEORY AND APPLICATIONS OF MODELS OF COMPUTATION
IF:
0
论文数:
2
被引数:
0

机构

C
central research institute of electric power industry - japan
学者数:
885
论文数: 1.0K
被引数: 0
W
Waseda University
学者数:
1.0W
论文数: 8.7K
被引数: 8.3K
引用论文

引用论文