Study on due-window assignment scheduling based on common flow allowance

delete2015-07-01
delete18
PRE
AI
Y
Yu-Bin Wu
L
Long Wan
王晓远 封面图
王晓远 (Xiaoyuan Wang) *
DOI:10.1016/j.ijpe.2015.04.005delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The aim of this note is to show by a counter-example that some results in recent papers (Mosheiov and Oron, 2010; Mor and Mosheiov, 2012) are merely calculation mistakes. Correct results of these two papers are also provided. (C) 2015 Elsevier B.V. All rights reserved.
Keyword:
Scheduling
Due-window assignment
Maintenance activity
Common flow allowance
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Economics 封面图
International Journal of Production Economics
IF:
10
论文数:
8.0K
被引数:
3.6W

机构

S
Shenyang Aerospace University
学者数:
3.1K
论文数: 1.9K
被引数: 2.0K
引用论文

引用论文

err分享
err收藏
A survey on scheduling problems with due windows
err2015-04-01
err105
PREAI
errJaniak, Adam; Janiak, Wladyslaw A.; Krysiak, Tomasz; Kwiatkowski, Tomasz
err分享
err收藏
Two-machine flowshop scheduling with a truncated learning function to minimize the makespan
err2013-01-01
err67
PREAI
errCheng, T. C. E.; Wu, Chin-Chia; Chen, Juei-Chao; Wu, Wen-Hsiang; Cheng, Shuenn-Ren
err分享
err收藏
err分享
err收藏
Scheduling production for a sawmill: A robust optimization approach
err2014-04-01
err42
PREAI
errVaras, Mauricio; Maturana, Sergio; Pascual, Rodrigo; Vargas, Ignacio; Vera, Jorge
err分享
err收藏
学者 查看更多内容