返回
Study on Stochastic SCUC Based BESS Planning Problem
DOI:10.1109/ICEI.2017.26.png)
摘要
En 中文
The application of Battery-based Energy Storage System (BESS) has many benefits in the power grid such as frequency support, emergency assistance, lowering costs, and flattening the load curve. In this paper, a modified stochastic security-constrained unit commitment (SCUC) model is introduced to simulate the daily operation of power system. By setting both installed position and capacity of BESS as optimization variables, the model can give the optimal location and capacity of BESS simultaneously. Scenario trees are adopted to represent the forecasting inaccuracies of wind power and load. Furthermore, a benders decomposition based algorithm is used to solve the model. Two classical cases, IEEE 6-bus and IEEE 118-bus system, are used to verify the effectiveness of the proposed approach.
Keyword:
Battery-based Energy Storage System (BESS)
Capacity Configuration
Location Configuration
Stochastic SCUC
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
I
IF:
0
论文数:
9
被引数:
0

