Subcontractor schedule control method

delete2007-03-01
delete10
PRE
AI
C
Carrie Sturts Dossick *
T
Timothy K. Schunk
DOI:10.1061/(ASCE)0733-9364(2007)133:3(262)delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Trade coordination and claims documentation is a challenge on any project, particularly for specialty subcontractors. The writers introduce a schedule control method initiated by the subcontractor, which facilitates coordination and communication between a subcontractor and other project participants as well as documentation to the prime contractor. A case study illustrates the preparation of a trade-specific critical path method (CPM) schedule, which is updated on a regular basis. The writers also address the interrelationship between the CPM schedule, internal reporting, schedule of values, and labor tracking. It is difficult to ensure that all subcontractor-produced documentation is complementary, but it is well worth the effort when it comes to supporting a claim. Monthly schedule updates and narratives communicate the conflicts, issues, and schedule constraints the subcontractor experiences or anticipates on a project, thereby providing contractually required notice to the prime contractor during the project. This increases the likelihood of resolving issues during the project, while simultaneously protecting a subcontractor's position if change order requests are denied or if back charges are levied prompting a subcontractor to enforce its rights, execute a claim, or proceed to litigation.
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

暂无机构信息
引用论文

引用论文

暂无论文信息