arrow
返回

Supply chain integrated resource-constrained multi-project scheduling problem

delete2024-08-01
delete1
PRE
AI
M
Md. Asadujjaman *
H
Humyun Fuad Rahman
R
Ripon K. Chakrabortty
M
Michael J. Ryan
DOI:10.1016/j.cie.2024.110380delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Over the last few decades, supply chain integrated project scheduling problems have received greater attention to ensure profitability in organizations. Supply chain integrated project scheduling incorporates ordering project materials, conducting procurement from the suppliers, supplying materials to the warehouse, and executing project activities that create value in the integrated system. This paper presents a mathematical model and solution methods for a supply chain integrated resource constrained multi-project scheduling problem (SCIRCMPSP) with discounted cash flows. The mathematical model for the proposed SCIRCMPSP considers decisions regarding materials ordering (MO), supplier selection (SS), procurement, inventory, sharing of global resources among the projects, and completion of project activities within the deadline. A mixed integer programming (MIP) model is proposed for this SCIRCMPSP that aims to maximize the project's net present value (NPV). Five different meta-heuristic approaches are proposed to solve the model: immune algorithm (IA), genetic algorithm (GA), IA with forward-backward improvement (FBI) (IAFBI), GA with FBI (GAFBI), and surrogation-based GA (SGA). The performance of the meta-heuristics was tested on 72 self- generated small-to-large SCIRCMPSP instances ranging from 2 to 20 projects in a multi-project set, each with 30 to 120 activities. The experimental results demonstrate that the proposed SGA is significantly (p < 0.05) . 05 ) better than other algorithms in generating quality solutions. The effectiveness of the proposed SGA is further validated by solving classical multi-project benchmark instances. The results show that the proposed SGA is effective not only in solving SCIRCMPSPs but also in solving multi-project scheduling benchmark instances.
Keyword:
Supply chain management
Project scheduling
Multi-project
Meta-heuristic approach
Surrogation-based genetic algorithm

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

N
newcastle university - uk
学者数:
2.9W
论文数: 2.6W
被引数: 39
R
Rajshahi University of Engineering and Technology
学者数:
1.1K
论文数: 682
被引数: 950
引用论文

引用论文

Makespan-Driven Workflow Scheduling in Clouds Using Immune-Based PSO Algorithm
err2020-01-01
err51
errOAAI
errWang, Pengwei; Lei, Yinghui; Agbedanu, Promise Ricardo; Zhang, Zhaohui
err分享
err收藏
A genetic algorithm based on dual hesitant fuzzy preference relations for consensus group decision making
err2022-05-01
err19
PREAI
errCalache, Lucas Daniel Del Rosso; Camargo, Victor Claudio Bento; Osiro, Lauro; Carpinetti, Luiz Cesar Ribeiro
err分享
err收藏
Comparison of West African and Congo Basin Monkeypox Viruses in BALB/c and C57BL/6 Mice
err2010-01-27
err0
errOAAI
errChristina L. Hutson; Jason A. Abel; Darin S. Carroll; Victoria A. Olson; Zachary H. Braden; Christine M. Hughes; Michael Dillon; Consuelo Hopkins; Kevin L. Karem; Inger K. Damon; Jorge E. Osorio
err分享
err收藏
学者 查看更多内容