The generalized unit commitment problem

delete1995-01-01
delete0
PRE
AI
R
Ross Baldick
DOI:10.1109/59.373972delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
The authors formulate a generalized version of the unit commitment problem that can treat minimum up- and down-time constraints, power flow constraints, line flow limits, voltage limits, reserve constraints, ramp limits, and total fuel and energy limits on hydro and thermal power generating units. They propose an algorithm for this problem, based on Lagrangian decomposition, and demonstrate the algorithm with reference to a simple model system.>
err分享
err收藏
Adaptive general variable neighborhood search heuristics for solving the unit commitment problem
err2016-06-01
err33
PREAI
errTodosijevic, Raca; Mladenovic, Marko; Hanafi, Said; Mladenovic, Nenad; Crevits, Igor
err分享
err收藏
Studies on stochastic unit commitment formulation with flexible generating units
err2010-01-01
err39
PREAI
errDing, Xiaoying; Lee, Wei-Jen; Wang Jianxue; Liu, Lin
err分享
err收藏

期刊

IEEE Transactions on Power Systems 封面图
IEEE Transactions on Power Systems
IF:
7.2
论文数:
1.1W
被引数:
6.3W

机构

U
University of Texas at Austin
学者数:
2.3K
论文数: 925
被引数: 400
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Scheduling of hydrothermal power systems
err1993-01-01
err0
PREAI
errH. Yan; P.B. Luh; X. Guan; P.M. Rogan
err分享
err收藏
没有更多内容