arrow
返回

The land assembly problem revisited

delete2004-03-01
delete26
PRE
AI
F
Flávio Menezes *
R
Rohan Pitchford
DOI:10.1016/S0166-0462(03)00041-3delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
As in the standard land assembly problem, a developer wants to buy two adjacent blocks of land belonging to two different owners. The value of the two blocks of land to the developer is greater than the sum of the individual values of the blocks for each owner. Unlike the land assembly literature, however, our focus is on the incentive that each lot owner has to delay the start of negotiations, rather than on the public goods nature of the problem. An incentive for delay exists, for example, when owners perceive that being last to sell will allow them to capture a larger share of the joint surplus from the development. We show that competition at point of sale can cause equilibrium delay, and that cooperation at point of sale will eliminate delay. This suggests that strategic delay is another source for the inefficient allocation of land, in addition to the public-good type externality pointed out by Grossman and Hart [Bell Journal of Economics 11 (1980) 42] and O'Flaherty [Regional Science and Urban Economics 24 (1994) 287]. (C) 2004 Elsevier B.V. All rights reserved.
Keyword:
land assembly
coordination
inefficient delay

期刊

Regional Science and Urban Economics 封面图
Regional Science and Urban Economics
IF:
2.9
论文数:
2.3K
被引数:
4.8K

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
Short-term Load Forecasting Using Improved Similar Days Method
err2010-01-01
err0
PREAI
errQingqing Mu; Yonggang Wu; Xiaoqiang Pan; Liangyi Huang; Xian Li
err分享
err收藏