arrow
返回

The two-machine total completion time flow shop problem

delete1996-04-01
delete99
PRE
AI
D
DellaCroce, F *
N
Narayan, V
R
Roberto Tadei
DOI:10.1016/0377-2217(95)00351-7delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
In this paper we study the NP-hard scheduling problem of minimizing total completion time in a two-machine now shop. Five known lower bounds are discussed and two new ones are presented. A new dominance criterion is also proposed. Several versions of a branch and bound method are derived by applying, both individually and combined, these lower bounds. A heuristic procedure is also presented that uses a constructive O(n(2)) time method, which computes a good starting solution, together with a neighborhood search based on pairwise interchanges. Computational results show that the exact method can handle problems of up to 30 jobs in size within a reasonable amount of time and that the heuristic procedure has an average error of less than 0.5% from the optimal value and less than 2.7% from the lower bound.
Keyword:
flow shop scheduling
branch and bound
neighborhood search
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

暂无机构信息
引用论文

引用论文

Age-related gene expression signatures from limb skeletal muscles and the diaphragm in mice and rats reveal common and species-specific changes
err2023-07-12
err0
errOAAI
errTea Shavlakadze; Kun Xiong; Shawn Mishra; Corissa McEwen; Abhilash Gadi; Matthew Wakai; Hunter Salmon; Michael J. Stec; Nicole Negron; Min Ni; Yi Wei; Gurinder S. Atwal; Yu Bai; David J. Glass
err分享
err收藏
err分享
err收藏
Survival Experience Following Nd:YAG Laser Photoresection for Primary Bronchogenic Carcinoma
err1988-11-01
err0
PREAI
errShivraj J. Desai; Atul C. Mehta; Sharon VanderBrug Medendorp; Joseph A. Golish; Muzaffar Ahmad
err分享
err收藏
没有更多内容