Time-Cost Optimization Model Considering Float-Consumption Impact
DOI:10.1061/(ASCE)CO.1943-7862.0000966.png)
摘要
En 中文
The main objectives of construction projects are completing the project on time and within budget. Typically, there is a trade-off between time and cost. Time loss is costly and time savings can provide benefits to all the parties involved in the project. Time-cost optimization is essential for construction projects. The objective of time-cost optimization is to determine the optimum project duration corresponding to the minimum total cost. This is accomplished by shortening the duration of critical activities to reduce the overall project duration. Time-cost optimization techniques result in reducing the available total float for noncritical activities, and thus, reduce the schedule flexibility. This paper presents a nonlinear-integer programming model that is developed to solve the time-cost optimization problem taking into account the impact of total float loss. The model uses What'sBest solver to find an efficient solution to the optimization problem while incorporating the total float-loss cost calculated according to the float-commodity approach. The results are significant and allow project managers to exercise new trade-offs between time, cost, and flexibility, which will ultimately improve the chances of achieving project objectives.
Keyword:
PARTICLE SWARM OPTIMIZATION
CONSTRUCTION TIME
SCHEDULE
GA
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
引用论文
Analysis of the Predation By Aporcelaimellus Nivalis On Prey Nematodes From Different Prey Trophic Categories
Nematologica
IF0
The Exasperating Economic Misery in Nigeria: Can we Depend on Monetary Policy?尼日利亚令人沮丧的经济困境:我们能依赖货币政策吗?