Time-cost-quality tradeoff considering resource-scheduling problems

delete2023-11-01
delete4
delete
OA
AI
A
Ali Elkliny *
H
Haytham Sanad
E
Emad Etman
DOI:10.1016/j.asej.2023.102524delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Duration, cost, and resources are defined as project constraints. Consequently, in each project, one of these constraints is received attention compared with another. Thus, the abilities of construction project manager should include balancing these constraints in a way that all the project objectives are fulfilled. Achieving this balance is conducted by determining the best alternative for each activity, while minimizing project total cost and duration and satisfies resources constraints as well as smoothing resource histograms. For that purpose, this study aims at optimizing project schedule to provide this balance by using multi construction methods which is mainly based on multiskilling strategy. As will be discussed, to achieve this goal, a model was developed and genetic algorithm is used to preform optimization. This study contributes to the body of knowledge a model able to produce schedules with appropriate project duration, cost, and quality, also satisfy resource constraints with most leveled histograms.
Keyword:
Time-cost-quality trade off
Constrained resources
Unconstrained resources
Leveling
Construction method
Multiskilling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Ain Shams Engineering Journal 封面图
Ain Shams Engineering Journal
IF:
5.9
论文数:
3.4K
被引数:
1.2W

机构

E
egyptian knowledge bank (ekb)
学者数:
11.6W
论文数: 9.3W
被引数: 84
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Soil carbon and nitrogen stocks in traditional agricultural and agroforestry systems in the semiarid region of Brazil
err2013-06-01
err0
errOAAI
errJosé Augusto Amorim Silva do Sacramento; Ana Caroline de Moraes Araújo; Maria Eugenia Ortiz Escobar; Francisco Alisson da Silva Xavier; Ana Clara Rodrigues Cavalcante; Teógenes Senna de Oliveira
err分享
err收藏
学者 查看更多内容