返回
Time to build and aggregate work-in-progress
DOI:10.1016/S0925-5273(00)00116-X.png)
摘要
En 中文
We solve two models of time to build, a first, where production cannot be suspended once started and a second, with costless suspension of production, and use a numerical scheme to analyse the implications of these models for the dynamics of aggregate work-in-progress. (C) 2001 Elsevier Science B.V. All rights reserved.