返回
Timetable construction: the algorithms and complexity perspective
DOI:10.1007/s10479-012-1160-z.png)
摘要
En 中文
This paper advocates approaching timetable construction from the algorithms and complexity perspective, in which analysis of the specific problem under study is used to find efficient algorithms for some of its aspects, or to relate it to other problems. Examples are given of problem analyses leading to relaxations, phased approaches, very large-scale neighbourhood searches, bipartite matchings, ejection chains, and connections with standard NP-complete problems. Although a thorough treatment is not possible in a paper of this length, it is hoped that the examples will encourage timetabling researchers to explore further with a view to utilising some of the techniques in their own work.
Keyword:
Timetabling
Algorithms
NP-completeness
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.5
论文数:
8.2K
被引数:
2.5W
机构
暂无机构信息
引用论文
Financial Development, Economic Growth, and Environmental Degradation Nexus in ASIAN Emerging Markets金融发展、经济增长与环境退化关联性研究:亚洲新兴市场

