TOC-based planning and scheduling model

delete2007-02-21
delete4
PRE
AI
J
J. Schaefers
R
Riad Aggoune
F
Félix Bécker
R
Remi Fabbri
DOI:10.1080/00207540410001691910delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
A case study investigating a reengineering project based on theory of constraints fundamental measurements is presented. Bad bottom line results triggered the project. The main constraint is the market itself. Moreover, a policy constraint encouraging local optima in the planning and scheduling process limits the company from reaching its goal and prevents it from exploiting the market constraint. The paper also discusses briefly a risk analysis of such projects.
Keyword:
PACKING PROBLEMS
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
A Nordic approach to food safety risk management of seaweed for use as food
err2023-01-23
err0
errOAAI
errSolbjørg Hogstad; Dorthe Licht Cederberg; Helle Eriksen; Barbro Kollander; Grímur Ólafsson; Bjørg M ikkelsen
err分享
err收藏
62: IMPACT OF GENDER AND ETHNICITY ON OUTCOMES IN PATIENTS WITH SEPSIS AND AKI
err2020-01-01
err0
PREAI
errJean-Sebastien Rachoin; Elizabeth Cerceo; John Gaughan; Matthew Varner; Alexandra Vrancik; Lawrence Weisberg
err分享
err收藏
err分享
err收藏