返回
Total flow time minimization in a flowshop sequence-dependent group scheduling problem
DOI:10.1016/j.cor.2009.04.013.png)
摘要
En 中文
We have developed a mathematical programming model for minimizing total flow time of the flow shop sequence dependent group scheduling (FSDGS) problem, typically classified as F-m|fmls, S-plk, prmu|Sigma C-j. As the problem is shown to be strongly NP-hard, a tabu search (TS) algorithm as well as a hybrid ant colony optimization (HACO) algorithm have been developed to heuristically solve the problem. A lower bounding (LB) method based on the Branch-and-Price algorithm is also developed to evaluate the quality of the metaheuristic algorithms. In order to compare the performance of metaheuristic algorithms, random test problems, ranging in size from small, medium, to large are created and solved by both the TS and the HACO algorithms. A comparison shows that the HACO algorithm has a better performance than the TS algorithm. The results of the heuristic algorithms are also compared with the results of the LB method to evaluate the quality of the solutions. The LB method presented in this paper can be generalized to solve the FSDGS problem with other objective functions. (C) 2009 Elsevier Ltd. All rights reserved.
Keyword:
Sequence dependent scheduling
Group scheduling
Branch and price
Metaheuristics
Lower bound
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
4.3
论文数:
6.5K
被引数:
1.8W

