We study two single machine scheduling problems with two competing agents and the option of re-jecting jobs. We seek to minimize the scheduling criterion of one agent under the condition that the maximum completion time of the second agent does not exceed a given upper-bound. Moreover, we as -sume that jobs are either scheduled or rejected (incurring job-dependent penalties) subject to an upper bound on the total rejection cost. The scheduling objective for the first agent is either the makespan or the total completion time, while that of the second agent is the makespan. As both problems are known to be NP-hard, we develop efficient pseudo-polynomial dynamic programming algorithms to obtain opti-mal solutions. The algorithms are shown to efficiently solve medium to large size problems through an extensive numerical study. Crown Copyright (c) 2020 Published by Elsevier Ltd. All rights reserved.
Keyword:
Single machine
Two-agents
Rejection
Dynamic programming
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

O
Omega-International Journal of Management Science
IF:
7.2
论文数:
3.8K
被引数:
1.4W

机构

U
University of Sydney
学者数:
6.5W
论文数: 6.2W
被引数: 90
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
Early echocardiographic evaluation in children with anorexia nervosa in the emergency department of a tertiary level children's hospital.
err
IF0
err2022-07-14
err0
errOAAI
errGiulia Spina; Anna Clemente; Marco Roversi; Maria Rosaria Marchili; Paola Silvestri; Cristina Mascolo; Valeria Zanna; Antonella Diamanti; Antonino Reale; Alberto Villani; Umberto Raucci; Antonio Ammirati
err分享
err收藏
Multi-agent single machine scheduling多agent单机调度
err2007-01-10
err156
PREAI
errAgnetis, Alessandro; Pacciarelli, Dario; Pacifici, Andrea
err分享
err收藏
学者 查看更多内容