Two‐machine flowshop scheduling with conditional deteriorating second operations
DOI:10.1111/j.1475-3995.2006.00536.x.png)
摘要
En 中文
AbstractThis paper considers a flowshop‐scheduling problem with a waiting time constraint imposed to restrict the processing of the two operations of each job. If the second operation of a job cannot start within a specified waiting time after the completion of its first operation, then an extra processing time will be incurred for its second operation as a penalty. We first show that even a greatly restricted version of the problem is strongly 𝒩𝒫‐hard. We then develop an O(n2) algorithm to determine the makespan of a processing sequence of the jobs.