返回
Two-stage time minimizing assignment problem
DOI:10.1016/j.omega.2006.02.007.png)
摘要
En 中文
This paper deals with the optimal selection of in out of n facilities to first perform in given primary jobs in Stage-1 followed by the remaining (n - m) facilities performing optimally the (n - m) secondary jobs in Stage-II. It is assumed that in both the stages facilities perform in parallel. The aim of the proposed study is to find that set of in facilities performing the primary jobs in Stage-I for which the sum of the overall completion times of jobs in Stage-I and the corresponding optimal completion time of the secondary jobs in Stage-II by the remaining (n - m) facilities is the minimum. The developed solution methodology involves solving the standard time minimizing and cost minimizing assignment problems alternately after forbidding some facility-job pairings and suggests a polynomially bound algorithm. This proposed algorithm has been implemented and tested on a variety of test problems and its performance is found to be quite satisfactory. (C) 2006 Elsevier Ltd. All rights reserved.
Keyword:
combinatorial analysis
mathematical programming
non-linear programming
allocation
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
O
IF:
7.2
论文数:
3.8K
被引数:
1.7W
机构
引用论文
Structural basis of ribosomal frameshifting during translation of the SARS-CoV-2 RNA genomeSARS-CoV-2 RNA基因组翻译过程中核糖体移码的结构基础
Science
IF45.8

