Uncertain project scheduling problem with resource constraints
DOI:10.1007/s10845-014-0980-x.png)
摘要
En 中文
Project scheduling problem is to make a schedule for allocating the loans to a project such that the total cost and the completion time of the project are balanced under some constraints. This paper presents an uncertain project scheduling problem, of which both the duration times and the resources allocation times are uncertain variables. An uncertain programming model with multiple objectives is obtained, whose first objective is to minimize the total cost, and second objective is to minimize the overtime. Genetic algorithm is employed to solve the proposed uncertain project scheduling model, and its efficiency is illustrated by a numerical experiment.
Keyword:
Project scheduling
Uncertain programming
Uncertainty theory
Genetic algorithm
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.4
论文数:
3.5K
被引数:
1.1W
机构
引用论文
A two-stage hybrid flowshop scheduling problem in machine breakdown condition机器故障条件下的两阶段混合flowshop调度问题