返回
Unlocking hydropower potential: a collaborative framework for optimizing cascade reservoir drawdown
DOI:10.1016/j.seta.2025.104493.png)
摘要
En 中文
• 提出了一种新型协同消落框架,旨在提升水力发电量。
• 推导了水力发电、消落库容和径流之间的线性联系。
• 定量识别了消落库容对水力发电的贡献。
• 通过核密度估计提取了梯级水库的消落规则。
Keyword:
hydropower
drawdown storage
runoff
cascade reservoirs
kernel density estimation
期刊
IF:
7
论文数:
4.7K
被引数:
2.2W
机构
引用论文
Stage-wise optimizing operating rules for flood control in a multi-purpose reservoir
JOURNAL OF HYDROLOGY
IF6.3
Optimal allocation of flood prevention storage and dynamic operation of water levels to increase cascade reservoir hydropower generation防洪蓄水优化配置和水位动态调度增加梯级水库水力发电
RENEWABLE ENERGY
IF9.1
Methodology that improves water utilization and hydropower generation without increasing flood risk in mega cascade reservoirs在不增加大型梯级水库洪水风险的情况下提高水利用和水力发电的方法
ENERGY
IF9.4
Design of optimal operating rule curves for hydropower multi-reservoir systems by an influential optimization method
RENEWABLE ENERGY
IF9.1
Reservoir volume forecasting using artificial intelligence-based models: Artificial Neural Networks, Support Vector Regression, and Long Short-Term Memory使用基于人工智能的模型进行储层预测: 人工神经网络,支持向量回归和长短期记忆
JOURNAL OF HYDROLOGY
IF6.3

