arrow
返回

Using the deterministic approach model for project portfolio selection problem (PPSP) solutions

delete2023-09-01
delete3
delete
OA
AI
A
Akinlo Olorunju Mogbojuri *
O
Oludolapo Akanni Olanrewaju
DOI:10.1016/j.heliyon.2023.e19129delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Selection of projects using a robust technique is rare as most of the techniques are not considered useful due to the limitation on the number of projects that can be selected as well as cost saving projects not being selected. This study investigated the validity of a hybrid model -integrated analytical hierarchy process-goal programming (AHP-GP) -to avoid project portfolio selection problems delaying community development.The proposed model includes two steps: AHP to determine the project criteria, the relative importance of weights, and priority preferences, while the GP model was formulated to select the optimal projects. An empirical study on government agencies was carried out to validate the proposed model, and the results compared against GP as a standalone to solve the same problem. The results proved that the hybrid model (AHP-GP) was better than the GP model. AHP-GP has proved to be a robust mechanism most suitable for managerial use due to its ability to handle multi-criteria decision-making (MCDM) situations. This study showed that the hybrid model can select more projects and will create more jobs in the communities concerned compared to the single model (GP). The novelty of this study is the introduction of an integrated model formed from two distinct models as a deterministic approach to solving project portfolio selection problems.
Keyword:
Analytic hierarchy process
Community benefits
Goal programming
Multi-criteria decision making
Project portfolio selection problem
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Heliyon 封面图
Heliyon
IF:
3.6
论文数:
3.8W
被引数:
10.5W

机构

D
Durban University of Technology
学者数:
1.8K
论文数: 1.5K
被引数: 1.7K
引用论文

引用论文

err分享
err收藏
An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem
err2021-01-01
err23
errOAAI
errAsadujjaman, Md.; Rahman, Humyun Fuad; Chakrabortty, Ripon K.; Ryan, Michael J.
err分享
err收藏
学者 查看更多内容