返回
Valuing lead time
DOI:10.1016/j.jom.2014.06.002.png)
摘要
En 中文
When do short lead times warrant a cost premium? Decision makers generally agree that short lead times enhance competitiveness, but have struggled to quantify their benefits. Blackburn (2012) argued that the marginal value of time is low when demand is predictable and salvage values are high. de Treville et al. (2014) used real-options theory to quantify the relationship between mismatch cost and demand volatility, demonstrating that the marginal value of time increases with demand volatility, and with the volatility of demand volatility. We use the de Treville et al. model to explore the marginal value of time in three industrial supply chains facing relatively low demand volatility, extending the model to incorporate factors such as tender-loss risk, demand clustering in an order-up-to model, and use of a target fill rate that exceeded the newsvendor profit-maximizing order quantity. Each of these factors substantially increases the marginal value of time. In all of the companies under study, managers had underestimated the mismatch costs arising from lead time, so had underinvested in cutting lead times. (C) 2014 Elsevier B.V. All rights reserved.
Keyword:
Option theory
Manufacturing lead time
Supply-chain mismatch cost
Functional products
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
10.4
论文数:
1.7K
被引数:
1.2W
机构
引用论文
Disordered Route to the Coulomb Quantum Spin Liquid: Random Transverse Fields on Spin Ice inPr2Zr2O7

